|
|
|
Recreation Ground User Group Stanford-le-Hope Cricket Club, Stanford-le-Hope Rugby Football Club, United Services Bowls Club President: John E.Green
23 Feb 07 Phase One - Cladding on 1st Floor / Phase Two – Roof repairs / Phase Three - Tarmac is finished on the Tennis courts!
Phase One Cladding has been put onto the 1st Floor. This will be a great feature on both sides of the building. Phase Two Repairs to the roof of the existing building Phase Three The tarmac has been laid on the tennis courts – have a look at the two aerial photos as the courts look superb. The tennis court area will now be left for about four weeks to settle prior to the surface being coloured sprayed, probably in the early part of April. In the meantime the courts will remain locked for security purposes. Please be patient as this will ensure the surface will last for many years.
|