Stanford-Le-Hope Cricket Club
The Recreation Ground, Grove Road, Stanford-le-Hope, Thurrock, Essex, SS17 0ED; Clubhouse 01375 676000

SLHCC 1st XI get back to winning ways with a 20 point victory over Benfleet with Aussie Harry Maher grabbing 7-36 *** The 2nd XI just miss out on another 20 point victory after drawing with Old Brentwoods with Ian Sanderson striking 46 with the bat and claiming 4-33 with the ball *** The 3rd XI keep their promotion hopes going with a 8 wicket victory over Fives & Heronians with captain Geoff Lake hitting an unbeaten 67 *** A golden display with the bat saw Clive Ballard hit his first century for Stanford Le Hope with the 4th XI. Ballard ended up retiring Not Out on 130 but the mamouth knock was not enough victory over Hornchurch *** The Sunday XI win again this time over close rivals Thurrock with Robert Page hitting a half century **** DONT FORGET *** Super Sixes is this Sunday so make sure you come along for music, beer, BBQ and of course Cricket!!
Stanford-Le-Hope CC

About Us

Events
Fixtures
ESL Fixture Service
Tables

Play Cricket

Players

Results
Fantasy League
Super Sixes
Honours Board
Officers
Directions
Archive
Suggestion Box
SRGUG
SLHRFC
Links
Stanford-le-Hope
Recreation Ground User Group
Stanford-le-Hope Cricket Club, Stanford-le-Hope Rugby Football Club, United Services Bowls Club

President: John E.Green

 

23 Feb 07

    Phase One - Cladding on 1st Floor / Phase Two – Roof repairs / Phase Three - Tarmac is finished on the Tennis courts!

 

Phase One

Cladding has been put onto the 1st Floor.  This will be a great feature on both sides of the building.

 21stFeb07-1stFloorcladding.jpg (48494 bytes)21stFeb07-1stFloorpre-cladding.jpg (47418 bytes)

21stFeb07-Bowlssideofnewbuilding.jpg (53323 bytes)

Phase Two

Repairs to the roof of the existing building

 21stFeb07-RoofrepairstoPhase2.jpg (54581 bytes)

Phase Three

The tarmac has been laid on the tennis courts – have a look at the two aerial photos as the courts look superb.  The tennis court area will now be left for about four weeks to settle prior to the surface being coloured sprayed, probably in the early part of April.  In the meantime the courts will remain locked for security purposes.  Please be patient as this will ensure the surface will last for many years.

 21stFeb07-Tenniscourtssurfacefinished.jpg (67902 bytes)21stFeb07-Tenniscourtssurfacefinished2.jpg (60261 bytes)